IFA
TULLN
Data:
- Client: Bundesimmobiliengesellschaft
- Start of Construction: Mai 2016
- Completion: April 2017
- Area: 87.967 m2
- GFA above ground: 1.564 m2
- GFA underground: 292m2
- Construction Costs: € 3,3 Mio.
Services
- Architecture (ARGE SWAP Architekten with DELTA)
- Site Supervision
- Tender Preparation, Procurement & Processing
- integrative overall coordination
Special Features
- Architecture for one of the first laboratory and education buildings in Austria to be built from wood
- Low-energy house standard
- High degree of flexibility in the space design: none of the partition walls in the building are load-bearing
- Comfort for the users: optimum combination of the external sun blind and internal glare protection; workstations only directly next to the windows
- Fundamentally shorter building phase due to the high level of prefabrication of the wooden construction
- Winner of the architectural competition / Working group DELTA and SWAP architects
- Winner of the lower austria timber-construction prize 2018